GATE LNG Receiving Terminal

Challenge

Construction of two jetties for receiving Liquefied Natural Gas (LNG).

Our solution

 

  • Supply and piling of 64 steel tube piles Ø1420 mm and 45 piles Ø1220 mm 

  • Supply and erection of 2 access trestles and pipe racks 

  • Construction of 2 concrete decks (23x36 m +7.5 m NAP) 

  • Construction of 2 concrete superstructures up to +17.5 m NAP 

  • Supply and erection of multiple steel platforms, 4 staircases and 2 firefighting monitoring and lighting towers 

  • Erection of 8 LNG unloading arms and 2 gangway towers 

  • Supply, piling and assembly of 22 steel tube dolphin piles Ø2800 mm 

  • Supply and erection of 700 m walkways (Ø1220 mm) 

  • Supply and installation of lighting, cable trays and earthing 