Zeeburg locks island

Challenge

The narrow passage in the Amsterdam-Rijn Canal produced by the locks island constituted an increased safety risk.

Our solution

 

By taking away the locks island the constriction was removed. This created a wide lane for shipping.

Besides shipping, nature was also given more space thanks to the project, with the installation of a natural bank as a stepping stone to adjacent nature reserves.

During the works there was little or no negative impact on shipping, due to the traffic regulations implemented, including e.g. dynamic signs.

Do you have a question about this project?